1Enquiry
Drop or paste architectural drawings, photos or PDFs here, or click to choose files
2Client & site
3Balustrade runs & system
| Run | Length (mm) | Height above FFL (mm) | Glass | Turn at start | Panels |
|---|
Runs go in order, walking from the building. "Turn" is the direction you turn at the start of that run.
4Steel subframe
A starting take-off. Adjust sections and lengths to suit the engineer's design.
| Item | Section | kg/m | Length (mm) | Qty | kg |
|---|
5Decking, installation & extras
| Other cost item | Cost £ | Category |
|---|
General arrangement for engineer approval
The DXF is drawn true size in millimetres (model space), so the engineer can measure it directly in AutoCAD, DraftSight or similar. The sheet frame is scaled to A3.
Costing (internal)
Customer estimate
Saved jobs
| Est # | Date | Client | Site | Total ex VAT |
|---|
Price library (cost to you, ex VAT)
Items marked Guess are estimates. Firman Glass and Kensington (balustrade-systems.com) don't publish prices online, so those figures need replacing with your trade prices. Once you enter a real price, untick "Guess".
| Item | Category | Unit | Cost £ | Source / note | Guess |
|---|
Company details (shown on estimates & drawings)
Default markups (profit on cost)
Markup is profit as a % of cost: 100% on £1,000 of steel = £2,000 sell. The quote screen also shows the resulting overall margin.
